Toggle Menu

Planning Application

This page displays details of the selected application and its progress. The information and images are retrieved from the Council's Planning database. The scanning process takes place after the application has been validated, hence images for recent applications may not yet be displayed.

If the application has not been determined and provided it is before the consultation expiry date, you can use the Comment on this Application button to make representations on the proposal which will be forwarded to the Case Officer. Guidance is available for making comments on a planning application here.

For further information on how to view the working file.

Please Note : The End of Public Consultation period date is based on the earliest date a decision can be made following public consultation on an application. This date is a live field and is updated throughout the application stage based on consultations, revised consultations, site notices and press advertisement dates, where required. Therefore this date is subject to change and if you are unsure or require further information you are advised to check with the Case Officer.

Application Details
Application number HPK/2024/0264 Application type Full Planning - Small-scale MAJOR apps
Site address 10-12 , Bridgemont , Whaley Bridge , Derbyshire , SK23 7PB Proposal Demolition of existing buildings, redevelopment of site for 8 dwellings and associated works
Applicant name
Treville Properties Ltd
Agent name Ms Lynn Jones
Emery Planning
Applicant address Church Lane , New Mills , Derbyshire , SK22 4NP Agent address 1-4 South Park Business Court , Macclesfield , United Kingdom , SK11 8BS
Application status Consultations/Re-consultations issued

Received date 20/06/2024 Valid date 01/08/2024
Fee due 4624.00 Fee paid 4624.00
Determination required date 31/10/2024 Agreed extended date
Case Officer James Stannard
Start of Public Consultation period 07/08/2024 End of Public Consultation period 31/10/2024
Referred to Secretary of State date Referral expiry date
Decision by Delegated Decision Committee date
Decision Under assessment by case officer Decision Date
Temp permission expiry date Permission expiry date
Legal Obligation ref.

Site visits
Officer
Date
JAS 10/10/2024

Consultations
Name Address
Whaley Bridge Town Council Mechanics Institute, Market Street, Whaley Bridge, High Peak, SK23 7AA
The Owner / Occupier NARROWBOAT BRIAN, PEAK FOREST CANAL, WHALEY BRIDGE, SK23 7PD
Canal And River Trust Strategy, Planning & Design, Fradley Junction, Alrewas, Burton on Trent, Staffordshire, DE13 7DN
County Planning (Highways) Highways Section, County Hall, Matlock, Derbyshire, DE4 3AG
County Planning (Dev Control) Environmental Services DCC, Shand House, Dale Road South, Matlock, Derbyshire, DE4 3RY
County Planning (Flood Risk Management)
Network Rail Town Planning Team, Square One, 4 Travis Street, Manchester, M1 2NY
HPBC Environmental Health Town Hall, Buxton,
HPBC Arboricultural Officer Arboricultural Officer, Town Hall, Buxton,
HPBC Waste (Operational Services) LEEK
HPBC Service Commissioning team
HPBC Operational Services (Leisure / Recreation)
HPBC Regeneration - Economic Development Moorlands House, Leek,
HPBC Regeneration - Planning Policy Moorlands house, Leek,
HPBC Housing Strategy
Cllr Neville Clarke
Cllr David Lomax Whaley Bridge Ward,
Cllr Joanne Taylor Whaley Bridge,
The Owner / Occupier HAWTHORNS 6, BRIDGEMONT, WHALEY BRIDGE, SK23 7PB
The Owner / Occupier 30, HOCKERLEY NEW ROAD, WHALEY BRIDGE, SK23 7GA
The Owner / Occupier 31, HOCKERLEY NEW ROAD, WHALEY BRIDGE, SK23 7GA
The Owner / Occupier 29, HOCKERLEY NEW ROAD, WHALEY BRIDGE, SK23 7GA
The Owner / Occupier 27, HOCKERLEY NEW ROAD, WHALEY BRIDGE, SK23 7GA
The Owner / Occupier TESCO, BRIDGEMONT, WHALEY BRIDGE, SK23 7PD
The Owner / Occupier 2, BRIDGEMONT, WHALEY BRIDGE, SK23 7PB
The Owner / Occupier NARROWBOAT THE TEA COSY, PEAK FOREST CANAL, WHALEY BRIDGE,
HPBC Building Control Section Structural Engineer, Buxton, Derbyshire, SK13 6EL

Attachments - Click the Description to view the attachment in a new window.
Date Description
07/08/2024 4 18 6.8 silence Unit dB Acoustic Performance
07/08/2024 6 16 6.8 silence Unit dB Acoustic Performance
07/08/2024 6.8 16 6 silence spacer low E
07/08/2024 6.8 18 4 silence spacer low E
07/08/2024 Planning statement
07/08/2024 Ecological Baseline 2023_Part1
07/08/2024 Ecological Baseline 2023_Part2
07/08/2024 Sustainability Statement
07/08/2024 2023 12 01 REV A Buxton Rd Landscaping
07/08/2024 2049 BNG FA 01 JW KC
07/08/2024 10566 - SW NETWORK CALCULATIONS P01
07/08/2024 10566-HBL-XX-XX-DR-D-0001 EXISTING IMPERMEABLE AREAS (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0002 PROPOSED IMPERMEABLE AREAS (P01).
07/08/2024 10566-HBL-XX-XX-DR-D-0003 PROPOSED CONTRIBUTING AREAS (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0004 PROPOSED DRAINAGE STRATEGY PLAN (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0005 SW LONG SECTIONS NETWORK 1 (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0006 SW LONG SECTIONS NETWORK 2 (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0007 SW MANHOLE SCHEDULE (P01).
07/08/2024 10566-HBL-XX-XX-DR-D-0008 FW LONG SECTIONS NETWORKS 1 AND 2 (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0009 FW MANHOLE SCHEDULE (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0010 FLOW EXCEEDANCE PLAN (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0100 TYPICAL DRAINAGE CONSTRUCTION DETAILS SHEET 1 (P01)
07/08/2024 10566-HBL-XX-XX-DR-D-0101 TYPICAL DRAINAGE CONSTRUCTION DETAILS SHEET 2 (P01)
07/08/2024 10566-HBL-XX-XX-RP-D-0001 DRAINAGE STRATEGY (P01)
07/08/2024 10566-HBL-XX-XX-RP-D-0001 DRAINAGE STRATEGY APPENDICES (P01)_Part1
07/08/2024 10566-HBL-XX-XX-RP-D-0001 DRAINAGE STRATEGY APPENDICES (P01)_Part2
07/08/2024 10566-HBL-XX-XX-RP-D-0001 DRAINAGE STRATEGY APPENDICES (P01)_Part3
07/08/2024 10566-HBL-XX-XX-RP-D-0002 DRAINAGE MAINTENANCE SCHEDULE (P01)
07/08/2024 41817R2 Bridgmont Phase 2 Site Investigation Iss RevB 19Apr2019_Part1
07/08/2024 41817R2 Bridgmont Phase 2 Site Investigation Iss RevB 19Apr2019_Part2
07/08/2024 41817R2 Bridgmont Phase 2 Site Investigation Iss RevB 19Apr2019_Part3
07/08/2024 41817R2 Bridgmont Phase 2 Site Investigation Iss RevB 19Apr2019_Part4.
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part1
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part2
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part3
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part4.
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part5
07/08/2024 42320R1 10-12 Bridgemont Whaley Phase 1 Site Investigation Iss RevA - R_Part6
07/08/2024 411174 40 P2 Existing Site Plan and Location Plan
07/08/2024 411174 41 P9 Proposed Site Plan
07/08/2024 411174 42 P4 Proposed Plans and Elevations Plots 1-4.
07/08/2024 411174 43 P3 Proposed Plans and Elevations Plots 5-6
07/08/2024 411174 44 P3 Proposed Plans and Elevations Plots 7-8.
07/08/2024 411174 45 P3 Proposed Site Sections
07/08/2024 Application Form
07/08/2024 Bradstone pennine construction
07/08/2024 Buxton Road Bridgemont-BS5837 Report Stage 1-Version 2 19.12.23
07/08/2024 Buxton Road Bridgemont-BS5837 Report Stage 2-Version 2 26.01.24.
07/08/2024 Maintainable Highway
07/08/2024 Rockdoor-Brochure-2023_Part1
07/08/2024 Rockdoor-Brochure-2023_Part2
07/08/2024 roof material slate
07/08/2024 SCP_240662_Buxton Road_Travel Plan Statement_12.07.24_EW_issue(1.0).
07/08/2024 SCP_240662_Transport Statement_12.07.24_complete(1.0)
07/08/2024 Visofold Series_IMS104DVS.201804 (1)
07/08/2024 windows and doors spec
07/08/2024 Consultation Response Flood Risk Management DCC 07.08.24
08/08/2024 Consultation Response Network Rail
09/08/2024 Consultation Response Alliance Environmental Services Ltd
12/08/2024 Consultation Response Network Rail 2
22/08/2024 Consultation Response DCC Highways
22/08/2024 Consultation Response Canal and River Trust
29/08/2024 Consultation Response Canal and River Trust
09/09/2024 Consultation Response United Utilities
25/09/2024 Consultation Response Whaley Bridge Town Council
04/11/2024 Consultation Response Environmental Health
06/11/2024 Consultation Response Derbyshire Wildlife Trust

Share this page

Share on Facebook Share on Twitter Share by email

Print

Print this page